News 2020

2020-11-06

November 2020 - Stimulations start

Picture for November 2020 - Stimulations start

2020-08-11

July 2020 - Completion 3

Picture for July 2020 - Completion 3

2020-06-01

June 2020 - Instrumentation

The injection and production boreholes were drilled and completed. Though these boreholes water will be  pressed into the rock and then extracted.

2020-05-01

May 2020 - Completion 2

The remaining monitoring boreholes were drilled.

2020-05-01

May 2020 - Completion 1

The pilot boreholes were reamed up from 96mm to the required diameter for instrumentation and cementation.